NDPE acquired a used 12,000-gallon propane tank built in 1973 from a South Texas fuel plant. NDPE fully refurbished the tank and installed at a school in Central North Dakota. This system allows the school to purchase heating fuel at a much lower cost throughout the year.
Temporary Fuel During New Constrution
North Dakota Petroleum Equipment, Inc., was the General Contractor for Velocity Rail Solutions, an A. Stucki Company. NDPE provided a temporary fuel system until the demolition and setup of new fuel system was complete in Grand Forks, ND.
Grass Roots Service Plants
NDPE was contracted to compete the fuel distribution plant for the newly constructed Williston International airport. The Williston North Dakota airport is one of newest technology equipped airports in the Northern Plains.